Logistics park constructed by Synergy PEB
Supply Chain Infrastructure

Logistics ParkConstruction in India.

Built by a team that handles design, manufacturing, and erection in-house. Every structure here is engineered for high vertical clearance, multi-dock loading, and fast turnaround across India.

Get a Quote
Throughput
Multi-Dock Bays
Precision
3D BIM & CNC Lines
Clear Span
Up to 90 Meters
Compliance
IS 800 & MBMA 2012
Logistics park constructed by Synergy PEB
Supply Chain Infrastructure

Overview — What Are Logistics Park Buildings?

This Synergy PEB building is a high-clearance distribution hub. Built for high-density storage, multi-dock loading, freight sorting, and automated fulfilment. It's what an industrial logistics park actually needs. Not a warehouse with extra doors bolted on.

We use tapered H-beams, wide clear-span portal frames, dock leveller pits, and standing seam roofing. All of it comes out of our 70,000 sq. ft. plant. That's what a facility like this should deliver — maximum storage volume and fast fleet turnaround. Not just four walls and a roof.

Multi-Dock Freight Operations

Built for rapid truck loading and unloading. The way a busy hub needs.

High Volumetric Clearance

Eave heights up to 18 m. Part of every multi modal logistics park we design.

Supply Chain Advantages

Key Features & Benefits

Getting this right means speed, column-free clear spans, and low maintenance. Supply chains don't stop moving, so your building shouldn't slow them down.

Multi-Dock Loading Bays & High Throughput - Synergy PEB Logistics Park Feature

Multi-Dock Loading Bays & High Throughput

Fast truck turnaround, dock levellers built in

Fast truck turnaround, dock levellers built in. Perimeter loading docks, canopy overhangs, and dock leveller pits keep freight moving. Whether it's one truck or a full fleet.

High-Clearance Spans up to 90m - Synergy PEB Logistics Park Feature

High-Clearance Spans up to 90m

Column-free layout for automated sorting

Column-free layout for automated sorting. Get unobstructed spans up to 90 meters wide. Room for conveyor belts, automated sorters, and multi-tier racking, all in the same industrial logistics park.

Rapid 30%-50% Fast-Track Deployment - Synergy PEB Logistics Park Feature

Rapid 30%-50% Fast-Track Deployment

Parallel manufacturing and site erection

Parallel manufacturing and site erection. Frames and purlins get fabricated in 3-5 weeks. So your logistics park in India opens on schedule, not months behind it.

Weather-Tight Standing Seam Roofing - Synergy PEB Logistics Park Feature

Weather-Tight Standing Seam Roofing

100% leak-proof, built-in daylighting

100% leak-proof, built-in daylighting. Standing seam panels with concealed fasteners protect what's inside. Polycarbonate roof sheets cut your daytime power bill.

Engineering Specs

Specifications & Capabilities

Every logistics park in India we build starts with 3D BIM modeling. Then it goes through strict quality control, start to finish.

Primary Framing System

IS 2062 E350 / ASTM A572 Grade 50

Tapered rigid columns and rafters, welded for long clear spans. The backbone of every multi modal logistics park we build.

Secondary Purlins & Girts

Cold-formed high-tensile C and Z

Galvanised coating, built for structural framing and roof support.

Clear Span Capabilities

Up to 90m column-free spans

Open interior bays, built for sorters, forklifts, and high-density racking. Standard in any industrial logistics park.

Dock Loading Overhangs

Cantilevered Canopy Extensions

Weather canopies over truck docks, so loading doesn't stop for rain.

Design Standards

IS 800:2007, MBMA 2012, IS 875

Built for wind load, seismic zones, and heavy rainfall. The standard for any logistics park in India.

Surface Protection

Sa 2.5 Shot Blasting + Epoxy Primer

Automated shot blasting, then a high-build primer coat. Real 30-year service life.

Got Questions?

Frequently Asked Questions?

What you need to know about industrial logistics park design, clear spans, dock loading bays, and build timelines

Ready when you are

Let's buildtogether.

One team, start to finish design, manufacturing, and erection for your next project. Tell us what you're building.